Qualification-led replacement supply

Replacement Wear Components for Mineral Processing Equipment

A controlled supply route for existing hydrocyclone, slurry-pump and mineral-screening configurations, starting from non-confidential identification, dimensions, material and interface requirements.

See qualification workflow
Hydrocyclone

Hydrocyclone wear parts

Apex/spigot, vortex finder and selected replaceable liners for reviewed existing configurations.

Slurry pump

Slurry-pump wet-end parts

Impeller, throatbush and selected wet-end liners for identified pump configurations.

Screening

Mineral screening wear media

Trommel replacement panels plus modular rubber and polyurethane screening panels.

Existing equipment first. Claims second.

01

Identify

Equipment, component, material and interface.

02

Review

Non-confidential dimensions and references.

03

Inspect

Critical dimensions and material against agreed scope.

04

Qualify

First article and controlled trial where appropriate.

Scope boundary: replacement qualification is not a promise of OEM equivalence, guaranteed fit, process improvement, throughput, recovery, screening efficiency or wear life.